Construction is well underway on site with all areas stripped back to base build. The new escalator area has been cut that will link Queen and Lorne Streets and the base of the central light-well removed to pull light throughout the heart of the building. The removal of the mezzanine floor will begin shortly - creating a large, approx 890m2 double height retail opportunity that is unique to Queen Street.